Last Updated: 29 October 2020
z/VM Version 7 Release 2 Architecture Level Set
z/VM 7.2 supports the following IBM Z and IBM LinuxONE servers:
- IBM z15 Models T01 and T02
- LinuxONE III Models LT1 and LT2
- IBM z14 Models M01, M02, M03, M04, M05, and ZR1
- LinuxONE Emperor II
- LinuxONE Rockhopper II
- z13
- z13s
- LinuxONE Emperor
- LinuxONE Rockhopper type 2965
Specifically, the architecture level required by z/VM 7.2 is z/Architecture with the following facilities:
- Compare-and-swap-and-store facility and facility 2
- Constrained-transactional-execution facility
- DAT-enhancement facilities 1 and 2
- Decimal-floating-point facility
- Decimal-floating-point packed-conversion facility
- Decimal-floating-point zoned-conversion facility
- Distinct-operands facility
- Enhanced-DAT facility 1
- Enhanced suppression on protection
- ETF2-enhancement facility
- ETF3-enhancement facility
- Execute-extensions facility
- Execution-hint facility
- Extended-immediate facility
- Extended-translation facilities 2 and 3
- Fast-BCR-serialization facility
- Floating-point-support enhancement facilities (comprising the FPR-GR-transfer, FPS-sign-handling, and DFP-rounding facilities)
- General-instructions-extension facility
- High-word facility
- Interlocked-access facilities 1 and 2v
- List-directed initial-program-load
- Load-and-trap facility
- Load-and-zero-rightmost-byte facility
- Load-program-parameter facility
- Load/store-on-condition facilities 1 and 2
- Long-displacement facility
- Message-security assist
- Miscellaneous-instruction-extensions facility 1
- Move-with-optional-specifications facility
- Parsing-enhancement facility
- PFPO facility
- Population-count facility
- Processor-assist facility
- Store-clock-fast facility
- Store-facility-list-extended facility
- Transactional-execution facility
- Vector facility for z/Architecture
Refer to z/Architecture Principles of Operation, Chapter 1, for descriptions of these facilities.
Return to z/VM V7.2.